Boeing says Dreamliner test flight ‘went to plan’

Boeing says Dreamliner test flight ‘went to plan’

Boeing says Dreamliner test flight 'went to plan'

Boeing has said a flight to test the new batteries on the Dreamliner “went to plan”.

All 50 Dreamliners in operation have been grounded and orders delayed following a fire in a battery on a Japan Airlines 787 in Boston on January 7 and an emergency landing by an All Nippon Airways aircraft in Japan shortly afterwards when a battery started producing smoke.

A 787 took off at 12:11pm Pacific Time from the airfield at Boeing’s main production plant in Everett, Washington, for the “functional test flight” and returned two hours later.

The aircraft was the first to be fitted with lithium-ion batteries designed to reduce the risk of overheating.

Boeing said it would assess the data and prepare for another test flight to reassure regulators.

The battery redesign plan was approved by the US Federal Aviation Administration (FAA) earlier this month.

US transportation secretary Ray LaHood said at the time: “This comprehensive series of tests will show us whether the proposed battery improvements will work as designed.”

But he added: “We won’t allow the plane to return to service unless we’re satisfied that the new design ensures the safety of the aircraft and its passengers.”

Carnival cancels more Triumph cruises, plus Sunshine sailings

Carnival cancels more Triumph cruises, plus Sunshine sailings

By Tom Stieghorst

Carnival Cruise Lines said it will cancel an additional 10 scheduled sailings of the Carnival Triumph, moving back the date the ship resumes service from mid-April to June 3.

Also, Carnival canceled the first two cruises of the Carnival Sunshine, which was scheduled to emerge from drydock in April after a $155 million refurbishment of the former Carnival Destiny.

Carnival said it is pushing back the re-entry of service for both ships to install additional operating redundancies and fire-control measures, and to broaden the scope of hotel services that can be run off of emergency power supplies.

The changes are the first implementation of measures covered in Carnival’s fleet-wide operations review following the Carnival Triumph engine room fire in February.

The Sunshine’s first European cruise is now scheduled for May 5. Guests on the two canceled cruises will get a full refund, reimbursement for nonrefundable travel costs and a 25% discount on a future cruise.

Guests on the canceled Triumph cruises will get similar compensation.

FAA approves Boeing plan to fix Dreamliner battery

FAA approves Boeing plan to fix Dreamliner battery

By Kate Rice
The Federal Aviation Administration has approved Boeing’s certification plan for the redesign of the 787 Dreamliner.

The certification plan is the first step toward returning the 787 to service, and will require extensive testing and analysis.

“This comprehensive series of tests will show us whether the proposed battery improvements will work as designed,” said Transportation Secretary Ray LaHood.