New Mein Schiff Relax Launched at Fincantieri

The launch of Mein Schiff Relax, the first of two InTUItion class new concept cruise ships that are dual-fuel powered (LNG and MGO) that Fincantieri is building for TUI Cruises, a joint venture between TUI AG and Royal Caribbean Cruises, took place at the Monfalcone shipyard.

The godmother of the ship was Elena Sperti, an employee of the shipyard.

At 160,000 tons the ship is a new prototype for the TUI fleet developed by Fincantieri and due to enter service in early 2025.

The vessels will be future-proof thanks to their ability to also burn low-emission fuels such as bio- or e-LNG: an important step towards climate-neutral cruising.

Zero Emissions Target: First LNG Cruise Ship to the U.S.

Mardi Gras

Anticipating the first LNG-fueled cruise ship to sail out of a U.S. port, Carnival Cruise Line’s Mardi Gras, Tom Strang, senior vice president of maritime affairs for Carnival Corporation, told Cruise Industry News that the company has worked closely with Port Canaveral, the LNG supplier, the Coast Guard and other stakeholders, paving the way.

“There were little formal rules existing on ship-to-ship bunkering,” he explained, “so together with Shell and Port Canaveral, we have agreed to follow the standardized processes we developed for our bunkering operations in Europe, in Tenerife and Barcelona. Our LNG ships pretty much share the same technical platform enabling us to follow the same processes and procedures.”

Strang noted that crew and officers have been trained in the bunkering operation at CSMART where Carnival built a full-scale mock-up bunkering rig.

In addition, an engineering simulator was built for training purposes, and pilots also travelled to CSMART to learn how the ship will handle.

Explained Strang: “With LNG, the rate of loading of the engines is slightly slower with a gaseous fuel than with conventional fuel, but working with the engine manufacturer, the shipyard and Valmet’s automation engineers, we have been able to negate any major issues.

“Also, if there is an emergency and full power is needed immediately, the engines will switch over to diesel and you get an immediate response.”

In addition, some MGO has to be burnt routinely to keep it moving through the tanks, he added. It is also used as a pilot fuel for the LNG.

Bunkering by barge in Port Canaveral, the process for the Mardi Gras will take about six to eight hours, according to Strang. That is longer than conventional bunkering, and the goal is to find ways to speed up the process, while obviously maintaining safety, he noted.

LNG will take Carnival all the way to IMO’s 2030 greenhouse gas reduction target as far as the newbuilds are concerned. “We have 21 new ships on order,” Strang said, “and 10 of them are LNG, after the AIDAnova, which entered service late last year.

“The percentage of the fleet with LNG will be high. Later we will also see how we can continue to reduce our carbon emissions by potentially introducing biogas or synthetic gas into the supply chain.”