AIDAprima Guests Test Self Check-In Terminals in Hamburg

AIDAprima Guests Test Self Check-In Terminals in Hamburg

AIDA Cruises tested digital guest check-in with all guests for the first time in a pilot project at the Steinwerder Cruise Center in Hamburg.

According to a company statement, guests were able to embark independently for a cruise aboard the AIDAprima at one of the 20 digital check-in terminals on July 23, 2026.

During check-in, a photo was taken of each guest, which is stored in the ship system for the duration of the trip. The image was then compared with the photo on guests’ ID documents based on biometric data.

Digital check-in was found to speed up the embarkation process at the terminal, offering more flexibility in combination with the personal service available at a classic counter.

The new service was developed in collaboration with Lufthansa Industry Solutions over a period of two years, adapting self-service check-in terminals from aviation for use in cruises.

This included, among other things, the integration of printers for boarding passes and the connection to the ship’s systems.

The boarding pass is RFID-encoded, serving as a means of payment onboard and as a key to the cabin, among other things.

AIDA noted that it intends to use the findings from the pilot project to explore further use of this technology.

Viking Reveals Names of Its Next Two Ocean Ships

Viking Reveals Names of Its Next Two Ocean Ships

Viking recently revealed that its next two ocean newbuilds will be called the Viking Leda and the Viking Vega.

Currently under construction at the Fincantieri shipyard, the 998-passenger ships will join the company’s fleet, respectively, in late 2028 and mid-2029.

As previously announced, Viking is also set to take delivery of three ships between 2026 and 2028, including the Viking Libra, the Viking Astrea and the Viking Lyra.

The Viking Leda is scheduled to enter service in December 2028, kicking off a winter schedule in the Mediterranean.

According to published deployment, the vessel will offer a series of eight- to 16-day itineraries departing from Greece, Italy and Spain.

The cruises sail to destinations in the Aegean, the Mediterranean and the Atlantic, including the Greek Islands, the French Riviera and Morocco.

The Viking Vega is set to debut in June 2029, welcoming its first guests in the Mediterranean.

After offering itineraries in Southern Europe, the vessel is scheduled to reposition to the British Isles in mid-July 2029.

Highlights of the ship’s inaugural season include cruises departing from ports in Italy, Spain, Norway and the United Kingdom, such as Civitavecchia, Barcelona and Bergen.

The Leda and the Vega will be the 17th and 18th ocean ships built for Viking at the Fincantieri shipyard in Italy.

The 47,000-ton vessels will feature a design similar to the Viking Star, which was the first newbuild introduced by the company in 2015.

In addition to the two ships, Viking’s current orderbook includes nine other vessels, with deliveries scheduled between 2026 and 2031.

Before welcoming the Leda and the Vega, the company is taking delivery of the industry’s first hydrogen-powered ships.

Set to be delivered in 2027 and 2028, respectively, the Viking Astrea and the Viking Lyra will be able to operate with zero emissions using a new technology that relies on containerized fuel.

Viking’s lineup also includes two additional expedition ships, which will join the Viking Octantis and the Viking Polaris in 2030 and 2031.

Duffy: 65 Original Destiny Crew Members Still with Carnival

Duffy: 65 Original Destiny Crew Members Still with Carnival

Thirty years after the ship’s debut, 65 crew members from the delivery team of the original Carnival Destiny, which entered service in 1996, are still working with Carnival Cruise Line.

“I think that says a lot about the Carnival family, the culture and our leaders,” the company’s President Christine Duffy said.

Speaking at the steel-cutting ceremony of the new Carnival Destiny, Duffy said that many crew members who started their careers on the 101,000-ton ship now hold leadership positions.

“Many started in entry-level positions and have grown their careers across the fleet and in our headquarters offices,” she continued.

Three Deck Officers who were part of the Destiny’s first bridge team are now Captains in Carnival’s fleet, while two Technical Officers are now Chief Engineers.

Duffy noted that John Heald, who currently serves as Carnival’s Brand Ambassador, was also onboard as the ship’s Cruise Director.

Introducing a new design to the company’s fleet, the new Carnival Destiny is scheduled to enter service in 2029.

As the first vessel in the new Ace-class series, the 230,000-ton ship will be built at Fincantieri’s Monfalcone shipyard in Northern Italy.

With capacity for over 8,000 passengers at maximum occupancy, the new Destiny will become the largest ship in Carnival’s fleet.

While additional details of the vessel will be revealed at a later date, the company said that the ship will feature the most outward-facing areas in the company’s fleet.

The new Destiny will also feature a dining, beverage and entertainment lineup that is more than 70 percent new.

Two additional Ace-class ships are set to be built by Fincantieri, with deliveries scheduled for 2030 and 2031.

Carnival is also building two additional Excel-class ships, the Carnival Festivale and the Carnival Tropicale, at the Meyer Werft shipyard in Germany. The 183,900-ton sister ships are scheduled to enter service in 2027 and 2028, respectively.